We successfully cope with tasks of varying complexity, provide long-term guarantees and regularly keep up with new trends and technologies.
Km 3, Refinery Road, Effurun-Warri, Delta State
Some of our ongoing and completed projects
Home
Our Projects
Environmental Impact Assessment (EIA) for Integrated Waste Management Facility, Beneku, Kwale Delta State
Clent: SILVER STAR Environmental Nigeria Limited
Environmental Impact Assessment (EIA) for Integrated Energy and Waste Management Facility, Engineered Landfill, Ajoki, Edo State
Clent: Hega Environmental and General Services Limited
Environmental Impact Assessment (EIA) of brewery development project, bridge head, Onitsha, Anambra State
Clent: INTAFACT Beverages Limited (SABMILLER Group)
Environmental Impact Assessment (EIA) for Storage Tank Farm, Depot for Agro Allied Products in Habour Industrial Area Port Harcourt Rivers State
Clent: Resources Improvement and Manufacturing Company Limited (RIMCO)
Environmental Impact Assessment (EIA) for Jetty operations for receiving bulk petroleum products Northern Industrial Layout, Calabar, Cross Rivers State
Clent: DOZZY Oil and Maritime Services Limited
Environmental Impact Assessment (EIA) for petroleum storage facility, depot, Northern Industrial Layout, Calabar Cross Rivers State
Clent: SPECIALTY Oil Company Limited
Environmental Impact Assessment (EIA) study for the proposed engineered landfill in Aladja, Delta State
Clent: OLU TEE Engineering International Limited
Heat Radiation and Noise Survey for Flow Station, Kwale, Delta State
Clent: Sterling Energy Exploration Production Company (SEEPCO)
Natural Gas Analysis composition for Flow Station
Clent: Sterling Energy Exploration Production Company (SEEPCO)
Environmental Impact Assessment (EIA) study for Agge River Dredging
Clent: Sterling Energy Exploration Production Company (SEEPCO)
Environmental Impact Assessment (EIA) study for 158KM Pipeline project for both crude oil and gas pipeline route Agu – Ndoni 44KM for Crude oil and OPL 2004 -Agu F/S – Enyie T in Beneku 114KM for gas pipeline.
Clent: Sterling Energy Exploration Production Company (SEEPCO)
Environmental Impact Assessment (EIA) study for Gas Processing Plant. Ashtavinayak Hydrocarbon Limited, Kwale, Delta State
Clent: Odum Energy FZE
Environmental Baseline Study (EBS)/Environmental Impact Assessment Study of 3D Seismic Study OML 13, Akwa Ibom State.
Clent: Nemesis Nigeria LTD (NEPL/NOSL)
Environmental Baseline Study (EBS) Onere Field, Enyie Field, Anieze Field, Akubo Field, Okwuibome Field in OML 143 Delta State
Clent: Sterling Energy Exploration Production Company (SEEPCO)
Environmental Evaluation Study (EES) Beneku Flow stations I & II and Asemoku Flowstation and Jetty, OML 143, Delta State
Clent: Sterling Energy Exploration Production Company (SEEPCO)
Environmental Evaluation Study (EES) of Emporis Oil Technology Lube Plant, Kwale Delta State
Clent: Emporis Oil Technology
Environmental Compliance Monitoring of Beneku and Asemoku Flowstation & Jetty, OML 143 Kwale Delta State
Clent: Sterling Energy Exploration Production Company (SEEPCO)
Environmental Compliance Monitoring of Agu Flowstation and Ndoni Jetty OML 146, Imo State
Clent: Sterling Global Oil Resources Limited (SGORL)
Environmental Compliance Monitoring of Wastewater disposal from Rig Sites, OML 13 Eastern Obollo, Akwa Ibom State
Clent: Golden Age Drilling Services Limited – GADSL
Environmental Compliance Monitoring of Ashtavinayak Gas Processing Plant, Kwale, Delta State
Clent: Odum Energy
Environmental Impact Assessment Study of Utapate Field, OML 13 Akwa Ibom State
Clent: Nemesis Nigeria Limited